OUR PROJECTS
Power Plant

POWER PLANTS GENERATE
A consortium of Helmut GPECC Power Corporation . To complete the build of power plants , two 758-megawatt combined-cycle power plants fueled by clean-burning natural gas. The natural gas-fired, combined-cycle facility, which uses advanced emissions-control technology, is more efficient and significantly cleaner than plants using old technology. Helmut GPECC's was responsible for project management, engineering, procurement, construction, and commissioning of the twin Temple, plants in Cyprus and to be complete by 2025.




Chernobyl

CONFINEMENT SHELTER
The $1.3 billion NSC will enclose the reactor and associated debris—as well as the sarcophagus surrounding it—providing a confined space within which unstable upper portions of the sarcophagus can be taken apart and the remaining highly radioactive material removed to a long-term storage repository. This will reduce exposure of the existing shelter to weather, and restrict the release of radioactive dust that could result from an accidental collapse beneath the new confinement. It will also provide a safe working environment for cleanup personnel.




Clyde Refinery

PARRAMATTA HDS
Upgrading of the existing Clyde hydrodesulphurization unit to reduce Sulphur content in diesel from 50ppm to 10ppm. Estimated Project Value $35,000,000. The upgraded HDS unit is expected to achieve similar production rates while producing diesel with only 10ppm of Sulphur content in compliance with the federal legislation with adequate light cycle oil processing capabilities. New equipment would be installed as part of the proposal. This new equipment would include: new additional reactor approximately 1.5 times the size of the existing reactor; catalyst fill; quench oil system/pump; flare header (if necessary); feed and product analyzers; new spare fresh gas compressor; new spare feed pump; and reactor cool down facilities.



